by Platipus Anchors | Aug 27, 2020
Penton Hook Marina, Chertsey Project Overview Steep marina banks were suffering from stability and erosion issues which, if left unchecked, would reduce their ability to withstand the wash of manoeuvring boats and compromise the adjacent access ways. To ensure long...
by Platipus Anchors | Aug 6, 2020
A57 Land Slip – Slope Reinforcement Project Overview A landslip along a 100m stretch of the A57 Manchester Road just outside Sheffield resulted in a partial road closure whilst remedial solutions were considered. Solution Platipus Anchors were approached by Amey...
by Platipus Anchors | Jun 12, 2019
Temporary Slope Stabilisation – Wastewater Treatment Works Oldham, UK Project Overview As part of a Wastewater Treatment Works upgrade, a 25m x 50m stormwater retention tank was to be constructed. A formation level of 14m below existing ground level required a...
by Platipus Anchors | Nov 8, 2018
Savièse Slope Stabilisation – Switzerland Project Overview Soon after this 14m high slope had been excavated for a new building, a section of the slope failed due to unforeseen ground conditions leading to the immediate closure of the site. Before construction...
by Platipus Anchors | Jul 7, 2017
Mount Cotton Embankment – Redland, Australia Project Overview For permanent stability to support the Mount Cotton Road in South East Queensland, embankment stability measures were designed for an approximately 130m long slope, up to 4m in height with maximum...