Pioneering Percussion Driven Earth Anchors (PDEA®) for 40 Years

Menu
Farnborough Cutting, Hampshire – UK

Farnborough Cutting, Hampshire – UK

Farnborough Cutting, Hampshire – UK Project Overview Along this 140m long and 40m high stretch of railway cutting, movement was detected by slope monitors. A speed restriction of 20mph was implemented, requiring an immediate solution to prevent further movement...
Lillybank, Battle, East Sussex – UK

Lillybank, Battle, East Sussex – UK

Lillybank, Battle, East Sussex – UK Project Overview A new housing development of fifty 2 to 5 bedroom homes by Millwood Designer Homes required an erosion control solution on a slope around the boundary access road. Consisting of four sections, two cut slopes...
Vantage Copse, Southampton, Hampshire – UK

Vantage Copse, Southampton, Hampshire – UK

Vantage Copse, Southampton, Hampshire – UK Project Overview In a recent incident at the entrance of the Latitude housing development by Bellway Homes, a 4.75m high slope experienced a significant slip. The event, triggered by heavy plant operation at the slope’s...
Heartenoak Meadows, Hawkhurst, Kent – UK

Heartenoak Meadows, Hawkhurst, Kent – UK

Heartenoak Meadows, Hawkhurst, Kent – UK Project Overview A new housing development in Kent required an access road around the site boundary. The overall site was relatively flat, but along the proposed access road the ground level reduced forming a 7m high...
Pembury Hospital, Royal Tonbridge Wells, Kent – UK

Pembury Hospital, Royal Tonbridge Wells, Kent – UK

Pembury Hospital, Royal Tonbridge Wells, Kent – UK Project Overview Construction of a new £225 million hospital for the Tonbridge and Maidstone NHS Trust presented a cramped site with limited working space. Slope stabilisation was specified, allowing steepening...