by Platipus Anchors | Aug 21, 2019
Cut Face Slope – Herrington House, Gateshead College Project Overview As part of the redevelopment, Miller Homes wanted to increase land utilisation by excavating as close as possible to the Durham Road above the site. A 34m long excavation, 4m high and as steep...
by Platipus Anchors | Aug 21, 2019
Permanent Additional Reinforcement – Caradoc View, UK Project Overview This existing retaining wall, adjacent to these residential properties, was failing and required immediate attention. An added complication was that the wall was located below a busy local...
by Platipus Anchors | Aug 21, 2019
Permanent Sheet Piling – Honeycombe Beach, Bournemouth, UK Project Overview To enable Barratt Homes to build a prestigious housing development, overlooking the sea, at Honeycombe Beach, Boscombe vertical excavations into the hillside were required. Anchored...
by Platipus Anchors | Aug 21, 2019
Permanent Gabion Support – Penybanc, Carmarthenshire – South Wales Project Overview The developers of this new housing estate were not satisfied with the slope of the rear gardens. To level the gardens an additional layer of gabion baskets were needed. Due...