Pioneering Percussion Driven Earth Anchors (PDEA®) for 40 Years

Menu
Secondary Pipeline at km 108, Ecuador

Secondary Pipeline at km 108, Ecuador

Secondary Pipeline at km 108, Ecuador Project Overview Over the past 15 years this steep slope located at km 108, adjacent to the secondary pipeline and right-of-way, had experienced several failures. In June 2019, a military patrol reported another landslide of...
Pound Green, Reading

Pound Green, Reading

Pound Green, Reading Project Specification The embankment at Pound Green is a typical clay fill construction with poor compaction. Variations in water content, exacerbated by poor drainage both within the slope and at the toe were causing the material of the...
Penton Hook Marina, Chertsey

Penton Hook Marina, Chertsey

Penton Hook Marina, Chertsey Project Overview Steep marina banks were suffering from stability and erosion issues which, if left unchecked, would reduce their ability to withstand the wash of manoeuvring boats and compromise the adjacent access ways. Project Solution...
A57 Land Slip – Slope Reinforcement

A57 Land Slip – Slope Reinforcement

A57 Land Slip – Slope Reinforcement Project Overview A landslip along a 100m stretch of the A57 Manchester Road just outside Sheffield resulted in a partial road closure whilst remedial solutions were considered. Platipus Anchors were approached by Amey...