Pioneering Percussion Driven Earth Anchors (PDEA®) for 40 Years

Menu
Mercedes-Benz, Ashford, Kent – UK

Mercedes-Benz, Ashford, Kent – UK

Mercedes-Benz, Ashford, Kent – UK Project Overview As expansion took place at this Mercedes-Benz dealership, it became necessary to increase the space available for vehicle storage. To achieve this an existing stream needed to be diverted through a new cut...
Farnborough Cutting, Hampshire – UK

Farnborough Cutting, Hampshire – UK

Farnborough Cutting, Hampshire – UK Project Overview Along this 140m long and 40m high stretch of railway cutting, movement was detected by slope monitors. A speed restriction of 20mph was implemented, requiring an immediate solution to prevent further movement...
Lillybank, Battle, East Sussex – UK

Lillybank, Battle, East Sussex – UK

Lillybank, Battle, East Sussex – UK Project Overview A new housing development of fifty 2 to 5 bedroom homes by Millwood Designer Homes required an erosion control solution on a slope around the boundary access road. Consisting of four sections, two cut slopes...
Vantage Copse, Southampton, Hampshire – UK

Vantage Copse, Southampton, Hampshire – UK

Vantage Copse, Southampton, Hampshire – UK Project Overview In a recent incident at the entrance of the Latitude housing development by Bellway Homes, a 4.75m high slope experienced a significant slip. The event, triggered by heavy plant operation at the slope’s...
Hertford Union Canal, St Marks, Victoria Park – UK

Hertford Union Canal, St Marks, Victoria Park – UK

Hertford Union Canal, St Marks, Victoria Park – UK Project Overview Along the banks of the Hertford Union Canal, an exposed cut had stood for three months while sheet piling work took place to the tow path above. Due to an existing brick sewer underneath the...