Pips Place, Chiltern Hills

Pips Place, Chiltern Hills

Pips Place, Chiltern Hills Project Overview The London Olympic Park was built on a contaminated brownfield site. The Platipus Deadman Fixing System Plati-Mat (Olympic Spec) was specified to anchor a vast amount of semi mature and specimen trees as traditional driven...
Birmingham Health Innovation Campus

Birmingham Health Innovation Campus

Birmingham Health Innovation Campus Project Overview As part of the development of the new Birmingham Health Innovation Campus all available land needed to be maximised where possible. The original design included extending the existing contiguous piled wall which...
Platform Remedial Works – Rosewood, Queensland

Platform Remedial Works – Rosewood, Queensland

Platform Remedial Works – Rosewood, Queensland Project Overview The station in Rosewood was built in the 1960s and the west side of the Down Main platform was suffering from subsidence up to 200mm. A permanent anchoring solution was required to stabilize the...
Villa Retaining Wall Repair, Marseillan, France

Villa Retaining Wall Repair, Marseillan, France

Villa Retaining Wall Repair, Marseillan, France Project Overview This existing 2.7m high boundary retaining wall, located at a Villa in the desirable town of Marsellian in the South of France, was displaying signs of stress cracking and was beginning to fail due to a...
Pudsey Road Riverbank Restoration, Leeds

Pudsey Road Riverbank Restoration, Leeds

Pudsey Road Riverbank Restoration, Leeds Project Overview A 3.5m high road embankment affected by scouring at the toe and exacerbated by 2015 floods noting the site is located within Flood Zone 3 (High Risk). This resulted in some shallow sliding of the bank face...