CASE STUDY: The embankment at Pound Green is a typical clay fill construction with poor compaction. Poor drainage within the slope was causing the material of the embankment to move. Drainage was required using pipes in conjunction with Plati-Drains. For more information view the case study: https://lnkd.in/gf-wSAt
#platipus #platipusanchors #platidrain #percussiondrivenearthanchors #PDEA #earthanchors #groundanchors #civilengineering

