Pioneering Percussion Driven Earth Anchors (PDEA®) for 40 Years

Menu

Our past webinars

Please fill in this form to request access to our past webinar recordings

Which webinar recording are you interested in?

Webinars 2025

Platipus Housing & Development Webinar

Percussion Driven Earth Anchors for Local Authority Applications

All tiers of local authorities across the UK have utilised Platipus Anchors on numerous projects for over four decades. Our innovative Low Carbon Anchoring Solution (LCAS®) provides a quick and cost-effective method for a variety of applications. Explore the solutions in action with 3D animations and real-world case studies, before we conclude with an interactive Q&A session where the Platipus team will be on hand to answer your technical questions.

25th Sept

11am (UK)

Platipus Housing & Development Webinar

Resilient Ground Anchoring Solutions for Rail, Road & Flood Alleviation

Aimed at Engineers, Designers, and Contractors, this webinar covers how to get the most out of Platipus Anchors for your projects. Gain practical insights and learn how our ground anchoring solutions are utilised across a wide variety of temporary and permanent applications, including:  Erosion Control, Slope Stabilisation, Retaining Structures, Drainage Solutions.

22nd July

11am (UK)

Webinars 2024

Platipus Housing & Development Webinar

Anchoring Solutions for Housing Development Applications

Learn to maximise all buildable land and create safe access roads in challenging locations. Explore cost-effective solutions for retaining structures including gravity, cantilever, masonry and gabion walls, as well as sheet piling. See how our systems can reduce material requirements while improving structural integrity. Learn innovative approaches to stormwater containment using Low Carbon Anchoring Solutions (LCAS®) for attenuation tanks and pipelines, eliminating the requirement for any additional concrete encasement.

26th Sept

11am (UK)

Platipus Housing & Development Webinar

Reducing Embodied Carbon using Platipus AnchorS

This free-to-attend webinar demonstrates the various applications of the innovative Platipus Low Carbon Anchoring Solution (LCAS®) to reduce Embodied Carbon emissions. We’ll explore a variety of case studies including erosion control, slope stabilisation, earth retaining structures, scaffolding, pipeline buoyancy, and solar farms. See how retaining walls can be remediated as opposed to rebuilt and discover how Platipus Anchors can be an alternative to methods such as drilled and grouted anchors using cementitious materials and concrete kentledge. This is all achieved with measurable and verifiable Embodied Carbon emissions from cradle-to-site.

27th June

11am (UK)

Platipus Housing & Development Webinar

Low Carbon Anchoring Solutions (LCAS®) for Water Infrastructure Resilience

The Government and water companies plan massive investment to maintain, upgrade and improve the UK’s water infrastructure resilience. This webinar guides Engineers, Designers and Contractors on using low carbon ground anchors as a reliable temporary or permanent solution across a diverse range of applications including erosion control, slope stabilisation, earth retaining structures and pipeline / attenuation system buoyancy.

25th April

11am (UK)

Webinars 2023

Platipus Housing & Development Webinar

HOUSING DEVELOPMENT: Maximisation Of Land Use; Earth Retaining Structures, Cut Face Slopes, Slope Stabilisation, Erosion Control and Attenuation Ponds

The government has confirmed that they will meet their manifesto commitment to build 1 million homes during this Parliament. This webinar is aimed at Developers, Designers and Contractors and will cover the use of ground anchoring solutions for maximising land use in housing development. 

23rd November

11am (UK)

Ootsuda Ike Floating Solar Park - Kansai, Japan

ROADS & BRIDGES: Temporary and Permanent Ground Anchoring Solutions for Road Widening, Slope Stabilisation and Retaining Structures

Aimed at Engineers, Designers and Contractors this webinar will provide a practical insight on how earth anchors can be used on a range of temporary or permanent applications. Illustrated by relevant case studies and engaging animations, Platipus experts will guide you through this interesting topic which will be followed by an interactive Q&A session.

19th October

11am (UK)

Ootsuda Ike Floating Solar Park - Kansai, Japan

COUNTERACTING BUOYANCY OF PIPELINES & ATTENUATION SYSTEMS USING GROUND ANCHORS

Governments globally are investing in vital water infrastructure projects to tackle water pollution and increase resilience to drought. Our next webinar will provide a practical insight into how Platipus ground anchors can be used to counteract buoyant conditions often associated with the installation of pipes and attenuation systems, eliminating the need for placing additional fill, pipe saddles or weighted bags, pipe coatings or encasing pipes and tanks in concrete.

20th July

11am (UK)

Ootsuda Ike Floating Solar Park - Kansai, Japan

Ground Anchors for Photovoltaic Applications

With many countries pledging to achieve net zero over the coming decades this will require significant commitment to clean, resilient renewable energy sources like solar. Our next webinar will provide a practical insight into how Percussion Driven Earth Anchors (PDEA®) can be used for Agri-PV, Floating (FPV), Ground Mounted and Off-Grid Photovoltaic applications.

13th July

11am (UK)

The Hermitage, Petworth

Resilient Ground Anchoring Solutions for Rivers and Canals

The Government and Ofwat have announced over £1.6 billion of new investment will be directed into vital infrastructure to improve our rivers, lakes and coastal waters. Our next industry specific webinar will provide a practical insight on how ground anchors can be used as a temporary or permanent solution for a diverse range of applications, all illustrated by engaging animations relevant case studies.

22nd June

11am (UK)

The Hermitage, Petworth

Rail Earthworks: Stabilising Slopes & Retaining Structures using Percussion Driven Earth Anchors

Network Rail has published details of framework opportunities covering large projects during the forthcoming Control Period 7 (CP7). We have refreshed our Rail Earthworks Webinar to provide a practical insight on how ground anchors can be used for a diverse range of rail applications, all illustrated by engaging animations and relevant case studies.

25th May

11am (UK)

The Hermitage, Petworth

Introduction to Percussion Driven Earth Anchors

Join us for our next free live webinar covering the design and installation of Percussion Driven Earth Anchors (PDEA®) for Civil Engineering and Construction applications. Aimed at Engineers, Designers and Contractors this updated presentation will provide a practical insight on how ground anchors can be used as a temporary or permanent solution for earth retaining structures and cut face slopes through to slope stabilisation and erosion control.

27th April

11am (UK)

Webinars 2022

Haddon Town Center ADS Storm Detention Structure Township - Platipus pipeline anchoring System

The Hermitage

Stabilisation and Sensitive Restoration of a Historic Retaining Wall in Petworth, UK

27th July

11am (UK)

Haddon Town Center ADS Storm Detention Structure Township - Platipus pipeline anchoring System

SOLAR Webinar

Anchoring Solutions for all Ground Mounted, Off-Grid and Floating (FPV) Applications. Transitioning to a net-zero world is one of the greatest challenges humankind has faced and a global commitment to the use of renewable energy will be the principal source of supply, solar being the largest.

23rd June

11am (UK)

Haddon Town Center ADS Storm Detention Structure Township - Platipus pipeline anchoring System

HOUSING DEVELOPMENT

Maximisation of land use with Percussion Driven Earth Anchors.
This webinar is aimed at Developers, Designers and Contractors and will cover the use of Percussion Driven Earth Anchors (PDEA®) for maximising land use in housing development.

26th May

11am (UK)

Haddon Town Center ADS Storm Detention Structure Township - Platipus pipeline anchoring System

Rail Earthworks

Stabilising Slopes & Retaining Structures using (PDEA®) – Following the announcement of Control Period 7 frameworks, we have refreshed our Webinar with new case studies, including the Slope Stabilisation of a Network Rail asset at the Birmingham Health Innovation Campus.

28th April

11am (UK)

Haddon Town Center ADS Storm Detention Structure Township - Platipus pipeline anchoring System

CONCEPT TO COMPLETION:

Geo-Environmental Services Ltd (GESL) present their innovative slope stabilisation design, incorporating ground anchors, between a rail line and a proposed high voltage substation on a new campus construction at Birmingham University.

27th Jan

11am (UK)

Webinars 2021

Platipus Earth Anchors - Temporary Cut Face Slopes at Oris Wastewater Treatment Site

CONCEPT TO COMPLETION:

Dr Stephen Thomas of OGI Groundwater Specialists will present his award-winning Stable-Earth™ design comprising of groundwater management, slope reinforcement and erosion control for the temporary works slopes at Royton Waste Water Treatment Works in Oldham.

18th Nov

11am (UK)

Haddon Town Center ADS Storm Detention Structure Township - Platipus pipeline anchoring System

CONCEPT TO COMPLETION:

Platipus Anchors x Geosynthetics Ltd = Resilient Solutions for Erosion Control and Slope Stability

29th Sept

11am (UK)

Haddon Town Center ADS Storm Detention Structure Township - Platipus pipeline anchoring System

FLOOD PROTECTION:

RESILIENT ANCHORING SOLUTIONS FOR EROSION CONTROL, SHALLOW SLIDES, DEEP SEATED FAILURES AND SLOPE DRAINAGE

15th July

11am (UK)

Haddon Town Center ADS Storm Detention Structure Township - Platipus pipeline anchoring System

PIPELINES:

COUNTERACTING BUOYANCY AND PROTECTING INFRASTRUCTURE USING PERCUSSION DRIVEN EARTH ANCHORS (PDEA®)

17th June

11am (UK)

Fully completed extension to the Redbridge Road solar park

HOUSING DEVELOPMENT:

MAXIMISATION OF LAND USE;EARTH RETAINING STRUCTURES, CUT FACE SLOPES, SLOPE STABILISATION, EROSION CONTROL & ATTENUATION PONDS

20th May

11am (UK)

Fully completed extension to the Redbridge Road solar park

SOLAR:

ANCHORING SOLUTIONS FOR ALL FLOATING, GROUND MOUNTED AND
OFF-GRID APPLICATIONS

15th April

11am (UK)

Fully completed extension to the Redbridge Road solar park

ROADS & BRIDGES:

PERCUSSION DRIVEN EARTH ANCHORS (PDEA®) FOR ROAD WIDENING, SLOPE STABILISATION AND RETAINING STRUCTURES

18th March

11am (UK)

Concept to completion webinar with VIP Guest Ross Conquest and Platipus Anchors

RAIL EARTHWORKS:

STABILISING INFRASTRUCTURE SLOPES & EARTH RETAINING STRUCTURES USING PERCUSSION DRIVEN EARTH ANCHORS (PDEA®)

18th Feb

11am (UK)

Contact us if you are interested in any of the webinar recordings