From concept to completion: A sketch in a notebook done during a conversation with the client’s Geotech, in a coffee shop, shows almost everything we needed to proceed. Extensive Platipus site testing followed, then engineering drawings, the tender process and finally installation. Platipus were there every step of the way from the first day on site, training the contractor’s installers, giving engineering support throughout and even collecting the installation equipment on the last day. View the full case study: https://platipus-anchors.com/project/a57-land-slip-slope-reinforcement/