Pioneering Percussion Driven Earth Anchors (PDEA®) for 40 Years

Menu
Mill Lane Substation, Ringwood, Dorset

Mill Lane Substation, Ringwood, Dorset

Mill Lane Substation, Ringwood, Dorset Project Overview A river bank on the fast flowing river Avon had eroded over the years leaving the substation next to it vulnerable. To stabilise the bank a 68m sheet pile wall was designed to protect the substation and adjacent...
Henwick Turnback – UK

Henwick Turnback – UK

Henwick Turnback – UK Project Overview AMEY Rail installed a new signal in a railway cutting, and needed to provide support for the slope behind the signal, prior to construction of a proposed retaining wall. Solution Platipus Geotechnical Engineers suggested a...
The Hermitage, Petworth

The Hermitage, Petworth

The Hermitage, Petworth Project Overview A mass sandstone wall, constructed in the late 1700’s overlooking the Shimmings Valley, suffered a small collapse, with blocks of sandstone rolling into a well used public footpath. Original proposals to replace the entire wall...
Platform Remedial Works – Rosewood, Queensland

Platform Remedial Works – Rosewood, Queensland

Platform Remedial Works – Rosewood, Queensland Project Overview The station in Rosewood was built in the 1960s and the west side of the Down Main platform was suffering from subsidence up to 200mm. A permanent anchoring solution was required to stabilize the...