Pioneering Percussion Driven Earth Anchors (PDEA®) for 40 Years

Menu
M351 Strasbourg, Grand-Est – France

M351 Strasbourg, Grand-Est – France

M351 Strasbourg, Grand-Est – France Project Overview During a multimodal development scheme to create a dedicated public transport lane on the M351, construction of a stormwater management basin was required. A 5m high, 165m long 65° cut-face slope would be...
A7 Bourg-Lés-Valence – France

A7 Bourg-Lés-Valence – France

A7 Bourg-Lés-Valence – France Project Overview The A7 motorway in Valence carries an average of 75,000 vehicles per day and up to 180,000 during holiday periods, while the National Road carries 16,000 vehicles per day. Keeping these roads open during works to...
Euro Airport Bale-Mulhouse, Saint-Lous – France

Euro Airport Bale-Mulhouse, Saint-Lous – France

Euro Airport Bale-Mulhouse, Saint-Lous – France Project Overview To allow Bale-Mulhouse Airport to continue to meet national and international regulations and comply with European Union Aviation Safety Standards (EASA), adaptions were required to existing...
Howden Storage Tank, Goole, Yorkshire – UK

Howden Storage Tank, Goole, Yorkshire – UK

Howden Storage Tank, Goole, Yorkshire – UK Project Overview Due to increasing volumes of storm and wastewater impacting Yorkshire Water’s existing assets, a new storage tank was required to increase capacity at the wastewater treatment works. Aligning with...
Colliers Gauging Station, Penshurst, Kent – UK

Colliers Gauging Station, Penshurst, Kent – UK

Colliers Gauging Station, Penshurst, Kent – UK Project Overview At an ultrasonic gauging station along the River Medway, a remedial slope reinforcement and soil retention solution was required following the erosion of vegetation and soil slips. Sheet piling...